Avoca Dell Telstra River Crossing
Project Name | Client | Expertise | Year | Location |
---|---|---|---|---|
Avoca Dell Telstra River Crossing | Telstra | Horizontal Directional Drilling | 2017 | Avoca Dell, SA |
Photographer | ||||
---|---|---|---|---|
TPC | ||||
Project Value : $250,000 |
Photos
TPC has recently been engaged to replace a damaged optic fibre cable that runs beneath the Murray River at Avoca Dell – Murray Bridge. With over 20+ years of experience in Horizontal Directional Drilling (HDD Technology) TPC were able to install a new conduit under the Murray River for over 300m and at a depth of 13m.
TPC has also been contracted by Telstra to replace damaged optic fibre cables throughout South Australia and the Northern Territory utilising a vast array of civil technology including Rock Sawing, Cable Ploughing and Directional Drilling.